<?xml version="1.0" encoding="UTF-8"?>
<urlset xmlns="http://www.sitemaps.org/schemas/sitemap/0.9"
        xmlns:image="http://www.google.com/schemas/sitemap-image/1.1">
  <url>
    <loc>https://www.kkdatasvc.com/house/build/steel-floor/</loc>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/cold-formed-steel-floor-joists-staged-2026-05-04.jpg</image:loc>
      <image:title>Sections delivered cut to length and stacked at the edge of the site.</image:title>
      <image:caption>Galvanized cold-formed steel floor sections stacked on gravel beside a stone retaining wall, 4 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/open-web-steel-joists-staged-on-site-2026-05-04.jpg</image:loc>
      <image:title>Open-web joists staged next to the foundation before being set.</image:title>
      <image:caption>Open-web steel joists staged on the ground next to the pier foundations, 4 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/steel-floor-beam-landing-on-pier-cap-2026-05-04.jpg</image:loc>
      <image:title>A beam landing on its pier cap. Each pier is levelled on its own.</image:title>
      <image:caption>Steel floor beam landing on a levelled pier cap plate above a concrete pier, 4 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/steel-floor-joists-being-set-2026-05-04.jpg</image:loc>
      <image:title>Joists going in. The stacked panels at left are wall components waiting their turn.</image:title>
      <image:caption>Crew setting steel floor joists across pier foundations with wall panels stacked at left, 4 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/steel-floor-joist-bolted-connection-detail-2026-05-05.jpg</image:loc>
      <image:title>A bolted joist-to-beam connection at close range.</image:title>
      <image:caption>Close-up of a bolted connection between steel floor joist and cross member, 5 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/steel-floor-frame-bolted-joint-2026-05-05.jpg</image:loc>
      <image:title>The same detail elsewhere in the frame.</image:title>
      <image:caption>Bolted joint in the steel floor frame above the gravel bed, 5 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/crew-fastening-steel-floor-frame-2026-05-05.jpg</image:loc>
      <image:title>Four of the crew working across the frame.</image:title>
      <image:caption>Four crew members fastening the steel floor frame on site, 5 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/steel-floor-frame-complete-crew-2026-05-05.jpg</image:loc>
      <image:title>By the afternoon the frame carries the crew standing on it.</image:title>
      <image:caption>Completed steel floor frame with crew standing on it, 5 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/crew-on-completed-steel-floor-platform-2026-05-05.jpg</image:loc>
      <image:title>End of day two, looking back across the platform.</image:title>
      <image:caption>Crew standing on the completed steel floor platform with the Missouri hillside behind, 5 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/pier-base-plate-anchor-bolts-shims-2026-05-06.jpg</image:loc>
      <image:title>A base plate with its anchor bolts and levelling shims.</image:title>
      <image:caption>Pier base plate with anchor bolts and levelling shims under the steel floor structure, 6 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/steel-floor-cross-member-connection-2026-05-06.jpg</image:loc>
      <image:title>A cross-member connection in the completed frame.</image:title>
      <image:caption>Cross member connection in the completed steel floor structure, 6 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/steel-floor/steel-floor-platform-with-wall-panels-staged-2026-05-06.jpg</image:loc>
      <image:title>The completed platform, with wall panels staged for the next stage.</image:title>
      <image:caption>Completed steel floor platform seen from above with prefabricated wall panels stacked alongside, 6 May 2026</image:caption>
    </image:image>
  </url>
  <url>
    <loc>https://www.kkdatasvc.com/house/build/envelope-and-services/</loc>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/roof-membrane-over-clad-wall-2026-05-15.jpg</image:loc>
      <image:title>The roof membrane going down over a wall that already has its finished face.</image:title>
      <image:caption>Black roof membrane laid across the roof deck above a wall already finished in wood-look cladding, 15 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/underground-services-run-through-gravel-2026-05-15.jpg</image:loc>
      <image:title>Drainage and water runs through the gravel, beside the deck frames waiting to be set.</image:title>
      <image:caption>White drainage pipe and blue water pipe running through a gravel bed beside stacked steel deck frames and a stone retaining wall, 15 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/crew-setting-steel-deck-frames-2026-05-15.jpg</image:loc>
      <image:title>Setting the deck frames onto the bank. Faces have been obscured.</image:title>
      <image:caption>Crew of six setting galvanized steel deck frames onto a stone bank on a wooded hillside, 15 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/steel-roof-trusses-and-wall-studs-inside-2026-05-18.jpg</image:loc>
      <image:title>Steel roof trusses over steel wall studs, seen from inside.</image:title>
      <image:caption>Interior view of steel roof trusses and steel wall studs with sheathing board between them, windows taped beyond, 18 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/interior-corner-steel-trusses-and-windows-2026-05-18.jpg</image:loc>
      <image:title>A corner of the same structure, windows in and taped.</image:title>
      <image:caption>Corner of a room framed in steel with roof trusses overhead and taped window openings looking onto the site, 18 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/exterior-wood-look-cladding-with-black-windows-2026-05-18.jpg</image:loc>
      <image:title>The same building from outside, on the same afternoon.</image:title>
      <image:caption>Exterior elevation in horizontal wood-look cladding with black-framed windows above a gravel bed, 18 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/telehandler-lifting-steel-deck-frame-2026-05-20.jpg</image:loc>
      <image:title>An assembled deck frame going up on straps.</image:title>
      <image:caption>Telehandler lifting an assembled galvanized steel deck frame with lifting straps, wooded site behind, 20 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/steel-deck-frame-set-over-membrane-2026-05-21.jpg</image:loc>
      <image:title>The frame set out over the membrane, ready for boarding.</image:title>
      <image:caption>Galvanized steel deck frame set out over a black membrane, with fixings and offcuts on the surface, 21 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/deck-boards-going-down-on-steel-frame-2026-05-26.jpg</image:loc>
      <image:title>Boards going down on the steel frame, balustrade already in.</image:title>
      <image:caption>Worker laying wood-look deck boards across the steel deck frame beside a metal balustrade, hills behind, 26 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/insulation-batts-between-steel-roof-members-2026-05-27.jpg</image:loc>
      <image:title>Insulation between the steel roof members, before the ceiling closes.</image:title>
      <image:caption>Insulation batts fitted between steel roof members above a sheathed ceiling, taped windows below, 27 May 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/envelope-and-services/plumbing-manifold-and-pipe-runs-behind-membrane-2026-05-28.jpg</image:loc>
      <image:title>The manifold and its pipe runs, fixed and photographed before the lining goes on.</image:title>
      <image:caption>Plumbing manifold with red and blue pipe runs fixed against sheathing behind a blue wall membrane, 28 May 2026</image:caption>
    </image:image>
  </url>
  <url>
    <loc>https://www.kkdatasvc.com/house/build/interior-fit-out/</loc>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/interior-room-finished-wall-panels-doorway-2026-07-12.jpg</image:loc>
      <image:title>12 July: one room already lined and finished, with the doorway open to the next.</image:title>
      <image:caption>Finished interior room with white wall panels, a window and an open doorway to a second room, 12 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/osb-lined-interior-room-with-deck-doorway-2026-07-24.jpg</image:loc>
      <image:title>24 July: the same house elsewhere — sheathing, a recessed panel, and a door onto the deck.</image:title>
      <image:caption>Interior room lined with oriented strand board sheathing, an electrical panel recessed in the wall and a door opening onto an outdoor deck, 24 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/crew-working-at-door-openings-steel-framed-house-2026-07-24.jpg</image:loc>
      <image:title>Three of the crew at the door openings, materials staged where they will be used.</image:title>
      <image:caption>Three crew members working at two door openings in a sheathed interior wall, with tools and materials on the floor, 24 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/protective-sheeting-over-floor-panels-2026-07-24.jpg</image:loc>
      <image:title>Protective sheeting over the floor panels while the rest of the fit-out runs.</image:title>
      <image:caption>Clear protective sheeting laid across finished floor panels in a sheathed room, with a door threshold at the near edge, 24 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/worker-laying-protective-sheeting-over-floor-2026-07-24.jpg</image:loc>
      <image:title>The sheeting going down, corner by corner.</image:title>
      <image:caption>Worker bending to smooth protective sheeting across a floor in a sheathed interior room, 24 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/underfloor-heating-cable-laid-in-bathroom-2026-07-24.jpg</image:loc>
      <image:title>Underfloor heating cable set out on its mat in a bathroom, pipe stubs already standing.</image:title>
      <image:caption>Electric underfloor heating cable laid in a serpentine pattern across a membrane mat in a bathroom, with pipe stubs standing at the far wall, 24 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/white-floor-panel-laid-in-osb-lined-room-2026-07-24.jpg</image:loc>
      <image:title>Floor panels laid out across a room still in sheathing.</image:title>
      <image:caption>Large white floor panel laid across a room lined with oriented strand board sheathing, 24 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/worker-floating-floor-topping-compound-2026-07-25.jpg</image:loc>
      <image:title>Floating the topping, kneeling on offcuts to stay off the wet surface.</image:title>
      <image:caption>Worker kneeling on board offcuts while floating a grey topping compound across a floor, a second worker working behind, 25 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/levelled-floor-topping-across-osb-lined-rooms-2026-07-25.jpg</image:loc>
      <image:title>The topping run out across the rooms, curing.</image:title>
      <image:caption>Levelled grey floor topping running across two sheathed rooms towards window openings, 25 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/finished-floor-topping-window-openings-2026-07-25.jpg</image:loc>
      <image:title>The same floor from the other side, window openings still untrimmed.</image:title>
      <image:caption>Finished grey floor topping in a sheathed room with window openings looking out to a stone retaining wall, 25 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/room-lined-with-white-wall-panels-windows-in-2026-07-27.jpg</image:loc>
      <image:title>27 July: panels up, windows in, the room still a workspace.</image:title>
      <image:caption>Room lined with white wall panels with windows installed, a step ladder and offcuts on the floor, 27 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/bathroom-wall-tiling-with-levelling-clips-2026-07-28.jpg</image:loc>
      <image:title>28 July: bathroom walls tiled over the waterproofing, levelling clips still in place.</image:title>
      <image:caption>Bathroom walls tiled over a red waterproofing membrane with orange levelling clips holding each tile flush, 28 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/finished-room-recessed-lighting-ceiling-2026-07-29.jpg</image:loc>
      <image:title>29 July: ceiling lined, downlights in, glazing to the outside.</image:title>
      <image:caption>Finished room with a lined ceiling, recessed downlights and glazed doors to the outside, 29 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/white-panelled-room-with-ceiling-beam-detail-2026-07-29.jpg</image:loc>
      <image:title>The same day, a room away: panel walls with the ceiling beam detail run out.</image:title>
      <image:caption>White panelled room with a dark ceiling beam detail, a window and a step ladder standing in the middle, 29 July 2026</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://www.kkdatasvc.com/house/build/interior-fit-out/finished-bedroom-wood-grain-ceiling-two-windows-2026-07-30.jpg</image:loc>
      <image:title>30 July: a finished room, eighteen days after the first photograph on this page.</image:title>
      <image:caption>Finished bedroom with a wood-grain lined ceiling, white wall panels and two windows looking onto the site, 30 July 2026</image:caption>
    </image:image>
  </url>
</urlset>
